《高層辦公:網(wǎng)格式立面設(shè)計》由會員分享,可在線閱讀,更多相關(guān)《高層辦公:網(wǎng)格式立面設(shè)計(28頁珍藏版)》請在裝配圖網(wǎng)上搜索。
1、
自1959年建成以來,北野建設(shè)的前長野總部經(jīng)歷了由吉村純?nèi)O(shè)計的一系列擴建,以適應(yīng)公司業(yè)務(wù)的擴展,但該建筑的部分已嚴(yán)重惡化,迫切需要一個重建計劃。
Since its construction in 1959, Kitano Construction's former Nagano headquarters has undergone a series of expansions designed by Junzo Yoshimura to accommodate the expansion of the company's business, but parts of th
2、e building had deteriorated significantly and a reconstruction plan was urgently needed.
為了最大限度地提高標(biāo)準(zhǔn)建筑面積,新總部大樓與舊建筑旋轉(zhuǎn)了90°,天際線比例放寬了道路和相鄰?fù)恋氐膶蔷€限制。為了最大限度地減少外部體量,建筑在北側(cè)的道路上后退了8米,在該區(qū)域創(chuàng)造了一個開放的空間,并更新了該城市區(qū)域的城市景觀。白色花崗巖和獨特的淺灰色條紋圖案貫穿整個外部,創(chuàng)造了與建筑形成對比的設(shè)計。
In order to maximize the standard floor area, the new
3、headquarters building was rotated 90° from the old building, with the skyline ratio relaxed against the diagonal restrictions of the road and adjacent land. In order to minimize the external volume, the building was set back 8 meters from the road on the north side, creating an open space in the are
4、a and renewing the urban landscape of this urban district. White granite with a distinctive light gray stripe pattern was used throughout the exterior, creating a design that contrasts with the building.
除了對周圍社區(qū)的貢獻,該建筑的地震隔離結(jié)構(gòu)被作為災(zāi)難發(fā)生時的BCP(業(yè)務(wù)連續(xù)性計劃)措施,這是另一個需要解決的問題。該結(jié)構(gòu)減輕了上部鋼架的重量,實現(xiàn)了約13米的無柱空間。此外,利用自然能
5、源的環(huán)境設(shè)施,如地?zé)崴椛淇照{(diào)系統(tǒng)和太陽能電池板,已被積極引入。
In addition to the contribution to the surrounding community, the building's seismic isolation structure was adopted as a BCP (Business Continuity Plan) measure in the event of a disaster, which was another issue to be addressed. This structure has reduced the weigh
6、t of the upper steel frame and realized a column-free space of approximately 13 meters. In addition, environmental facilities utilizing natural energy, such as a geothermal water radiant air conditioning system and solar panels, have been proactively introduced.
由吉村淳三設(shè)計的現(xiàn)有茶道室 "Kan-un-an "被重新安置在新總
7、部大樓的9層。手盆和臺階石的重新定位、露水通道的黑色石膏墻、以及土質(zhì)地板和天花板照明的設(shè)計都經(jīng)過精心設(shè)計,以滿足法律要求,同時不影響茶道室的精神性。一些室內(nèi)設(shè)計元素,如入口大廳和接待室,是與丹麥諾姆建筑事務(wù)所合作完成的"。
The existing tea ceremony room "Kan-un-an" designed by Junzo Yoshimura was relocated to the 9th floor of the new headquarters building. The repositioning of the hand basin and stepping st
8、ones, the black plaster walls of the dew path, and the design of the earthen floor and ceiling lighting were carefully designed to meet the legal???requirements while not compromising the spirituality of the tea ceremony room. Some of the interior design elements, such as the entrance hall and reception room, were a collaboration with the Danish Norm Architects."
平面圖剖面圖??
細(xì)部節(jié)點建筑師:Atsushi Kitagawara Architects地點:日本面積:7001 m2年份:2021