歡迎來(lái)到裝配圖網(wǎng)! | 幫助中心 裝配圖網(wǎng)zhuangpeitu.com!
裝配圖網(wǎng)
ImageVerifierCode 換一換
首頁(yè) 裝配圖網(wǎng) > 資源分類 > DOC文檔下載  

Prestressed Concrete Technology預(yù)應(yīng)力混凝土英語(yǔ)論文

  • 資源ID:37792380       資源大?。?span id="g0iueiq" class="font-tahoma">42.02KB        全文頁(yè)數(shù):5頁(yè)
  • 資源格式: DOC        下載積分:10積分
快捷下載 游客一鍵下載
會(huì)員登錄下載
微信登錄下載
三方登錄下載: 支付寶登錄   QQ登錄   微博登錄  
二維碼
微信掃一掃登錄
下載資源需要10積分
郵箱/手機(jī):
溫馨提示:
用戶名和密碼都是您填寫的郵箱或者手機(jī)號(hào),方便查詢和重復(fù)下載(系統(tǒng)自動(dòng)生成)
支付方式: 微信支付   
驗(yàn)證碼:   換一換

 
賬號(hào):
密碼:
驗(yàn)證碼:   換一換
  忘記密碼?
    
友情提示
2、PDF文件下載后,可能會(huì)被瀏覽器默認(rèn)打開,此種情況可以點(diǎn)擊瀏覽器菜單,保存網(wǎng)頁(yè)到桌面,就可以正常下載了。
3、本站不支持迅雷下載,請(qǐng)使用電腦自帶的IE瀏覽器,或者360瀏覽器、谷歌瀏覽器下載即可。
4、本站資源下載后的文檔和圖紙-無(wú)水印,預(yù)覽文檔經(jīng)過(guò)壓縮,下載后原文更清晰。
5、試題試卷類文檔,如果標(biāo)題沒(méi)有明確說(shuō)明有答案則都視為沒(méi)有答案,請(qǐng)知曉。

Prestressed Concrete Technology預(yù)應(yīng)力混凝土英語(yǔ)論文

Prestressed Concrete Technology 提綱: 摘要:預(yù)應(yīng)力混凝土的定義 正文:預(yù)應(yīng)力混凝土的應(yīng)用、實(shí)例應(yīng)用 討論:預(yù)應(yīng)力混凝土的優(yōu)點(diǎn)和缺點(diǎn) 總結(jié):預(yù)應(yīng)力混凝土的發(fā)展的前景 Introduction Prestressed concrete and reinforced concrete in principle are clearly different. In the design of the reinforced concrete beams, regardless of the concrete can be assumed that the tensile strength, for bending moment of tension is caused by reinforced to resist, the tension is through between reinforcement and concrete bonding and passed to the steel. For large scale craze and deformation for, although the high strength concrete has good bonding, to a great extent can restore; But in the concrete and steel bonding between poor ordinary concrete, is in fact cant recover. On the other hand, in the prestressed concrete, the purpose of prestressed reinforced by rapping or through the special is the anchorage to exert a force concrete, so all can have the function of concrete structure. Requirements of prestressed steel is used to produce active component in advance to add load, and cracking and deformation in larger extent can be restored. Abstract In order to avoid reinforced concrete structure of the premature fracture, make full use of high strength steel and high strength concrete, tried to in the concrete structure or structures under load before use, through the force applied, make by the tensile stress components is reduced, and even in pressure stress state of concrete component. Preloading stress is used to reduce or offset load caused by the concrete tensile stress, and the structure of the components in the smaller tensile stress control range, and even in the compression state, to delay the generation of crack in concrete and development, so as to improve the anti-cracking performance component and rigidity. Main text Prestressed concrete component to the method of pretensioned stressing and posttensioned. 1.pretensioned stressing In the concrete pouring, first by steel wire steel strand or will be composed of the prestressed tendon pulled to a specified stress, and the anchorage anchor in a pier at both ends pedestal, then installation template, the structure, steel and parts, and then pouring concrete and maintenance. When concrete after the specified strength, relax a pier at both ends of the tendons, through the bond will be the prestressed concrete and tension to produce preloading stress. A method based on first relatively advantageous pedestal long, the longest useful to more than one hundred meters, so sometimes called long term method. 2. Posttensioned. Firstly perfusion components ,then directly on prestressed method in the component. The general method is placed first after prestressed reinforcement of hole into a casing, the structure, steel and parts, then install the template and pouring concrete. Tendons first through the casing can also wear after. Concrete to strength, with a jack will introduces the pull to the stress and load demand anchor at each end of preloading stress at both ends by the anchorage to concrete component. In order to protect the tendons from corrosion and restore prestressed concrete and between the rapping, prestressed steel casing and the space between the water filling slurry must be real. Water in the mud up preservative effect, but also beneficial to restore prestressed concrete and between the rapping. In order to facilitate the construction, sometimes also can be used in the prestressed steel surface coating corrosion materials and plastic casing or oiled paper parcel of unbonded post-tensioned pre-stressing concrete muscle. The characteristics of prestressed concrete. (1).Improve the component of crack resistance. Because of a bear before the loading of prestressed concrete structures in the tension zone for preloading stress exists, so outside load, only when the prestressed concrete is all turned to offset the tensile and tensile strain is more than concrete ultimate tensile strain, component will craze. While general reinforced concrete structure are not present in the prestressing, the cracking of the size of the load only by concrete ultimate tensile strength, compressive strength for about 1/10 of the) have decided, and crack ability is very low. (2). Increase the stiffness of the component. Because of the prestressed concrete component of normal use, in the load effect under standard combination may not cracking or only a small cracks, concrete was basically in the elastic stage work, and the stiffness of the component than ordinary reinforced concrete member is increased. (3). Make full use of the high strength materials. As mentioned previously, common reinforced concrete members cant make full use of high strength materials. And prestressed concrete component, prestressed reinforced first is expected to pull, and then out load reinforced stress further increases, and should be always in high tensile stress state, that is, can effectively use high strength reinforced; And the strength of reinforced high, can reduce the need to the section area. At the same time, should as far as possible using high strength grade of concrete, and high strength steel to coordinates, to get better economic component section size. (4). Expand the application range of the component. Because of the prestressed concrete improvement component crack resistance, and can be used for waterproof, permeability and corrosion resistance requirements of the environment; Using high strength materials, the structure to be dexterous, rigidity, distortion, and can be used in the large span and heavy load and load under repeated the structure. Prestressed concrete has been widely applied to industrial and civil building and transportation construction. For example, 冂 prestressed concrete hollow slab shape roof board, roof, roof beam, crane beam, pre-stress Bridges, railway sleeper used in great quantities such as already. In hydraulic structure also has used to build dock, zhanqiao pier, pile, gate, DiaoDuShi, pressure conduit, circular pool, aqueduct, road, bridge, and work the roofing beams and hydropower station workshop crane beam structure component, also can used for the method of prestressed reinforced dam, tunnel lining. For some have unique requirements of the structure, such as the need to prevent water corrosion sea platforms, resistance to high temperature and high pressure nuclear power plants, large pressure vessel etc, using prestressed concrete structure is more its superiority, instead of other structure can match. Twenty years to build up a large number of prestressed concrete engineering, Among them are representative of the project have 63 layer prestressed concrete floor of guangdong international building; 214 meters tall Qingdao boc building; Monomer prestressed concrete is the biggest of the capital international airport new terminal, etc. (2) the prestressed concrete bridge structure development history in 1955, the railway departments in our country the successful development of the first piece of 12 m span of prestressed concrete railway bridge, built in 1956 28 hole 24 m new YiHe across the bridge. In 1957, the highway department in Beijing to build the first seat zhoukoudian prestressed concrete road test bridge, for single span 20 meters simply-supported T bridge. Built in 1959 in lanzhou qilihe HuangHeQiao, 7 main hole for 37.5 m cantilever beam bridge. And HuangHeQiao built new town, for five hole 33 m bridge model T simply supported and hole 66 m the bowstring arch bridge. Discussions Concrete is brittle material, high compressive strength, tensile/flexural strength but is low. Concrete tension or the bending, in a very small tensile stress/tensile strain state will craze. Ordinary steel reinforced concrete structure, such as beam, plate, general is being bending state, often reinforced havent under great flexural stress, concrete bending area has by cracking, and may even make reinforced exposure and rust. Therefore, the common reinforced concrete beam slab structure, the bearing capacity of the steel is far from plays out. Prestressed concrete is the high strength steel wire steel or along the flexural in advance by the direction for tension, and the tension is reinforced concrete in anchorage, so that by the structure of concrete flexural direction on the preloading stress. Control the size of the compressive pre-stress, can ensure that prestressed beams under bending plate design load, concrete bending area by basic do not produce tensile stress, not crack, can greatly improve the bearing capacity of beams and slabs. Technology make full use of the prestressed concrete compressive strength and high tensile strength of reinforced high characteristics, use material "foster strengths and circumvent weaknesses", greatly broaden the compound material engineering applications. At present, able to build big span reinforced concrete bridge, floor, tall buildings such as TV tower, etc, are all dependent on prestressed concrete technology. The loss of prestress mainly comes from the creep of engineering materials, namely in long-term stress the influence of permanent deformation. Press press concrete and tension of prestressed reinforced or steel strand, also can produce creep, lead to the loss of prestress. However, in the prestressed concrete structure design and calculation prestress loss of prestress will be taken into account. Prestressed concrete is generally used to build big span structure or decrease the structure building section, and the dimension. Choose high strength concrete and steel material will be, and can only be imposed higher the added stress, effectively increase or decrease the span structure structure section. Resistance to good, rigidity. Because of component prestress, greatly delayed the occurrence of crack, using in the load, component dont crack, or make crack delayed emergence, so improved the stiffness of the component, increased the durability of structures. Save material, reducing weight. Its structure because must use high strength materials, so it can reduce the dosage of steel and the component section size, save a steel and concrete, reduce weight structure, the large span and heavy load structure has the obvious superiority. Improve the shear capacity component. Test show that the longitudinal prestressed reinforced plays the role of anchor bolts, hindering component of inclined cracks appear and implementation, and because the curve of the prestressed concrete beams reinforced (beam) vertical component of force will be partly offset shear. Improve the stability of the members under. When the members under long fine is large, in be certain pressure then easy is bent, so that lose stability and destruction. If the reinforced concrete column prestress, make the longitudinal force reinforced tension very tight, not only prestressed reinforced itself is not easy to bending, and help to improve the resistance of concrete bending around the ability. Improve the resistance of the component fatigue performance. Because has strong of prestressed reinforced, in use for add lotus stage or unloading the stress changes caused by relatively small, therefore, can improve the anti-fatigue strength, this to bear the structure of the dynamic loads is very favorable. But, the complicated process of high quality requirements, they need to have a technology is equipped with skilled professional team. Need to have a certain special equipment, such as drawing machines, grouting equipment, etc. Prestressed concrete structure of the construction cost is larger, the number of components of the project with high cost less. Summary In order to adapt to the development of our national economy, ease traffic problem for people from the inconvenience of production and life, the application of prestressed concrete structure will be more wide range, so we should strengthen the improve the technical level of the prestressed scientific research work. And compared with that of the developed countries we prestressed concrete engineering of relatively backward. With our existing strong team, and some units in prestressed technique extension of earned income strength can bear and finish the important scientific research task. At the same time, the design and construction of the separation is also effect on our countrys rapid development of prestressed concrete structures are one of the factors. So it is necessary to established large powerful prestressed concrete engineering company, take on the major prestressed concrete engineering, and new technology for development research, and do well with the design and construction of the relationship between the, in order to improve the level of prestressed technique in our country. References 李國(guó)平.預(yù)應(yīng)力混凝土結(jié)構(gòu)發(fā)展史.建筑,2008 陳嘉輝.預(yù)應(yīng)力鋼筋混凝土在建筑中的應(yīng)用研究.建筑技術(shù),2009 4

注意事項(xiàng)

本文(Prestressed Concrete Technology預(yù)應(yīng)力混凝土英語(yǔ)論文)為本站會(huì)員(1888****888)主動(dòng)上傳,裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。 若此文所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng)(點(diǎn)擊聯(lián)系客服),我們立即給予刪除!

溫馨提示:如果因?yàn)榫W(wǎng)速或其他原因下載失敗請(qǐng)重新下載,重復(fù)下載不扣分。




關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號(hào):ICP2024067431號(hào)-1 川公網(wǎng)安備51140202000466號(hào)


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺(tái),本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng),我們立即給予刪除!

五月丁香婷婷狠狠色,亚洲日韩欧美精品久久久不卡,欧美日韩国产黄片三级,手机在线观看成人国产亚洲