《土方開挖完成后地面高程測量復(fù)核記錄》由會員分享,可在線閱讀,更多相關(guān)《土方開挖完成后地面高程測量復(fù)核記錄(1頁珍藏版)》請?jiān)谘b配圖網(wǎng)上搜索。
1、土土方方開開挖挖完完成成后后地地面面高高程程測測量量復(fù)復(fù)核核記記錄錄編號:工程名稱攀枝花市第八小學(xué)校運(yùn)動(dòng)場改造工程測量日期施工單位成都弗里奧體育設(shè)施工程有限公司水準(zhǔn)點(diǎn)高程測量部位網(wǎng)格間距放線示意圖:測點(diǎn)水準(zhǔn)儀讀數(shù)水準(zhǔn)點(diǎn)高程(m)(3)高 差(m)(4)設(shè)計(jì)高程(m)(5)實(shí)測高程(m)(6)偏差(mm)(7)=(5)-(6)后視(m)(1)前視(m)(2)(4)=(1)-(2)(6)=(3)+(4)BM01.2541072.0001071.5671.2541.6771072.000-0.4231071.5671071.577-101.2541.6761072.000-0.4221071.567
2、1071.578-111.2541.6751072.000-0.4211071.5671071.579-121.2541.6741072.000-0.4201071.5671071.580-131.2541.6731072.000-0.4191071.5671071.581-141.2541.6721072.000-0.4181071.5671071.582-151.2541.6711072.000-0.4171071.5671071.583-161.2541.6701072.000-0.4161071.5671071.584-171.2541.6691072.000-0.4151071.56
3、71071.585-181.2541.6681072.000-0.4141071.5671071.586-191.2541.6671072.000-0.4131071.5671071.587-201.2541.6661072.000-0.4121071.5671071.588-211.2541.6651072.000-0.4111071.5671071.589-221.2541.6641072.000-0.4101071.5671071.590-231.2541.6791072.000-0.4251071.5671071.575-81.2541.6781072.000-0.4241071.5671071.576-91.2541.6631072.000-0.4091071.5671071.591-24復(fù)核結(jié)論:施工單位技術(shù)負(fù)責(zé)人(簽字確認(rèn)):