SH 3503-2007 石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定 中英文對照表格.rar
SH 3503-2007 石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定 中英文對照表格.rar,SH,3503-2007,石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定,中英文對照表格,3503,2007,石油化工,建設(shè),工程項(xiàng)目,交工,技術(shù),文件,規(guī)定,中英文,對照,表格
SH 3503–J531
交流電動機(jī)安裝檢查及
空載運(yùn)行記錄
AC motor installation inspection and no-load operation record
工程名稱
Project description:
單元名稱
Unit description:
位號Tag No
拖動機(jī)械名稱Trailer
銘牌
Name plate
型號Type
額定功率Rated output
kW
防爆合格證號
Explosion-proof certificate No.
定子電壓Stator voltage
V
轉(zhuǎn)子電壓Rotor voltage
V
制造廠Manufacturer
定子電流Stator current
A
轉(zhuǎn)子電流Rotor current
A
出廠日期Ex-work date
轉(zhuǎn)速Speed
r/min
絕緣等級Insulation class
出廠編號Ex-work SN
檢查內(nèi)容
Inspection contents
檢查結(jié)果
Inspection results
電動機(jī)及接線 Motor and its wiring
銘牌參數(shù)、防爆類型、級別、組別與設(shè)計(jì)相符
Nameplate parameters, explosion-proof type, class and group are in compliance with design.
接線盒內(nèi)接線正確、緊固,絕緣件完好,電氣間隙和爬電距離符合要求
The wiring inside the junction box is correct and tightened with the insulation elements being in good condition. Electric clearance and creepage distance comply with relevant requirements.
防爆接線盒的隔爆面及進(jìn)線密封符合要求,螺栓和防松設(shè)施齊全
The explosion isolation surface of the explosion-proof junction box and the incoming line seal are in compliance with relevant requirements. Bolts and stop-fittings are complete.
電動機(jī)及其起動設(shè)備已按規(guī)定接地
Motor and starting equipment are grounded as specified.
測量定子繞組的絕緣電阻
Measure the insulation resistance of the stator winding.
MW
集電環(huán)表面清潔、光滑,刷架、刷握及電刷安裝符合要求
Collector ring surfaces are clean, smooth. The brush supports and handle are installed in accordance with relevant requirements.
軸承潤滑脂(油)良好,充填適量
Bearing lubrication grease (oil) is properly filled and in good condition.
盤動轉(zhuǎn)子靈活,無碰卡聲
Turn the rotor to make sure that it can rotate freely without any hitting and seizing sound.
電路Circuit
短路保護(hù)設(shè)備及整定值
Check the short-circuit protection equipment and setting.
A
過載保護(hù)設(shè)備及整定值
Check the overload protection equipment and setting.
A
主回路絕緣電阻
Check the main circuit insulation resistance.
MW
控制回路絕緣電阻
Check control loop insulation resistance
MW
控制、保護(hù)和連鎖回路模擬操作,其功能與設(shè)計(jì)相符
Conduct simulated operations on control, protection and interlocking circuits to make sure that their functions are in compliance with the design.
空載運(yùn)行
No-load operation
定子電流Stator current
A
轉(zhuǎn)子電流Rotor current
A
環(huán)境溫度Ambient Temp. ℃
電機(jī)溫度Motor temp.
℃
軸承溫度Bearing temp.
負(fù)荷端℃
Load end
非負(fù)荷端℃
No-load end
運(yùn)行時(shí)間Operation time
h
運(yùn)行日期Operation date
結(jié)論
Conclusion
備注
Remark
建設(shè)/監(jiān)理單位Owner / Supervision Unit
施工單位Construction Unit
專業(yè)工程師Discipline engineer
年(Y) 月(M) 日(D)
技術(shù)負(fù)責(zé)人Technical responsible person:
質(zhì)量檢查員Quality inspector:
班(組)長Group leader:
年(Y) 月(M) 日(D)
收藏
編號:1630137
類型:共享資源
大小:1.29MB
格式:RAR
上傳時(shí)間:2019-10-31
3
積分
- 關(guān) 鍵 詞:
-
SH
3503-2007
石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定
中英文對照表格
3503
2007
石油化工
建設(shè)
工程項(xiàng)目
交工
技術(shù)
文件
規(guī)定
中英文
對照
表格
- 資源描述:
-
SH 3503-2007 石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定 中英文對照表格.rar,SH,3503-2007,石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定,中英文對照表格,3503,2007,石油化工,建設(shè),工程項(xiàng)目,交工,技術(shù),文件,規(guī)定,中英文,對照,表格
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書面授權(quán),請勿作他用。