SH 3503–J623
主匯線槽、主橋架
安裝檢查記錄
Installation Inspection Record of Main Raceway and Cable Tray
工程名稱:
Project Description:
單元名稱:
Unit Description:
名稱Name
檢 查 項 目
Item of Inspection
檢查結果
Inspection Result
檢查日期
Inspection Date
備注
Remark
1
匯線槽、橋架安裝橫平、豎直,多層安裝時各層彎曲部分的弧度一致,且層間間距均勻,彎曲半徑應滿足電纜敷設時彎曲半徑的要求
Installation of main raceway and Cable tray should be flat or straight. When several layers are installed, radian of curving in layers should be consistent, and in even distance, and curving radius should meet the requirements of cable laying.
2
鍍鋅、涂漆表層完好無損
Galvanized and varnished coating should be in good condition.
3
對口連接牢靠、無毛刺,并預留適當的膨脹間隙,螺栓連接處已安裝加強板,螺母在匯線槽的外側
Connection of cable ends should be firm and without burrs, and is reserved with proper expansion clearance. Reinforcing plate is installed at bolting joints. Nuts are located outside the raceway.
4
匯線槽、橋架與支架連接牢靠,水平安裝長度超過50m有應力消除措施
Connection of raceway, cable tray and bracket is firm, length of horizontal installation is beyond 50m, and a measure for stress release is taken.
5
匯線槽、橋架已避開強電磁場、高溫、腐蝕性介質
Raceway and cable tray are kept away from medium of high electromagnetic field, high temperature and erosion.
6
匯線槽上的保護管開孔位置在匯線槽高度的2/3處以上
Opening hole for raceway protection pipe is located above 2/3 height clear the raceway.
7
匯線槽、橋架清凈,內部平整、光潔、無雜物、無毛刺
It is clean in surface of raceway and cable tray, and is flat, clear, and without debris or burrs inside.
8
匯線槽的隔板固定合理、牢靠
Clapboard of raceway is fixed properly and firmly.
9
匯線槽的蓋板固定合理、牢靠
The raceway is covered properly and firmly.
10
匯線槽的支架間距合理,且焊接牢靠
Distance between brackets of raceway is reasonable and is fixed by welding.
11
匯線槽有良好的接地
The raceway is properly grounded.
注:主匯線槽、主橋架指就地接線盒至控制室之間的匯線槽、橋架。
Remark: Main raceway and main cable tray refer to raceway and cable tray between local terminal box and the control room.
建設 / 監(jiān)理單位ConstructionOwner/Supervision Unit
施工單位Construction Unit
專業(yè)工程師:
Discipline Engineer:
年(Y) 月(M) 日(D)
技術負責人:Technical Responsible Person
質量檢查員: Quality Inspector:
安 裝 人:Installer
年(Y) 月(M) 日(D)
收藏
編號:1630137
類型:共享資源
大小:1.29MB
格式:RAR
上傳時間:2019-10-31
3
積分
- 關 鍵 詞:
-
SH
3503-2007
石油化工建設工程項目交工技術文件規(guī)定
中英文對照表格
3503
2007
石油化工
建設
工程項目
交工
技術
文件
規(guī)定
中英文
對照
表格
- 資源描述:
-
SH 3503-2007 石油化工建設工程項目交工技術文件規(guī)定 中英文對照表格.rar,SH,3503-2007,石油化工建設工程項目交工技術文件規(guī)定,中英文對照表格,3503,2007,石油化工,建設,工程項目,交工,技術,文件,規(guī)定,中英文,對照,表格
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
5. 裝配圖網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
裝配圖網所有資源均是用戶自行上傳分享,僅供網友學習交流,未經上傳用戶書面授權,請勿作他用。