SH 3503–J538
隔離開關(guān)、負(fù)荷開關(guān)
安裝調(diào)整記錄
Isolation switch and load switch installation adjustment record
工程名稱
Project description:
單元名稱
Unit description:
位號Tag No
名稱Description
銘牌
Name plate
開關(guān)型號Breaker type
電壓等級Voltage level
kV
制造廠Manufacturer
操動機(jī)構(gòu)型號Actuator type
出廠日期Ex-work date
出廠編號Ex-work SN
安裝檢查
Installation inspection
檢查內(nèi)容Inspection contents
檢查結(jié)果Result
開關(guān)、操縱機(jī)構(gòu)外觀完好,附件、產(chǎn)品隨機(jī)技術(shù)文件齊全
The breaker and actuator should be visually in good condition, and the fittings and technical documents should be complete.
開關(guān)、操動機(jī)構(gòu)安裝牢固,水平、垂直、極間距離偏差符合規(guī)范要求
The breaker and actuator should be installed firmly. The horizontal, vertical and phase-to-phase deviations should be in compliance with relevant requirements.
安裝在墻壁上的開關(guān)應(yīng)用穿墻螺栓固定
The switches installed on the wall should be fixed with bolts that go though the wall.
傳動裝置安裝正確,連接牢固,銷釘齊全,拉桿應(yīng)校直,彎曲時(shí)應(yīng)與原桿平行
The driving unit should be installed correctly and connected firmly. The screws should be complete, the tie-rod should be aligned and, when it is bent, it should be in parallel with the original rod.
傳動裝置與帶電部分距離符合規(guī)范要求,有防止拉桿折斷時(shí)觸及帶電部分的設(shè)施
The distance between the driving unit and the active part should conform to the requirements of relevant specification. There should have some facilities that can prevent contact with the active part in case that the tie-rod is broken.
開關(guān)操作靈活可靠,輔助開關(guān)動作及分、合指示正確,轉(zhuǎn)動部分涂以適宜的潤滑脂
The breaker can operate freely and reliably. The actions and open / close indications of the auxiliary breaker should be correct. The rotary part should be provided with suitable grease.
帶有接地刀刃的開關(guān),其閉鎖裝置動作靈活,準(zhǔn)確可靠
For breakers with grounding switch, their locking device should be able to act accurately and reliably.
絕緣件完整無損,表面清潔,油漆完整,相色標(biāo)志正確,接地良好
The insulation part should remain intact, its surfaces clean, and painting in good condition. The color identification should be correct, and the grounding should be well done.
安裝調(diào)整
Installation adjustment
項(xiàng)目Items
A相
Phase A
B相
Phase B
C相
Phase C
三極不同時(shí)關(guān)合距離(mm)Three-poles asynchronous closure distance
用0.05×10mm塞尺檢查接觸面插入深度(mm)
Use 0.005x10mm feeler gage to check contact surfaces for insertion depth.
開斷位置刀刃張開角度(°) Opening angle at open position.
開斷位置動靜觸頭間最小凈距(mm)
Min. net distance between moving and fixed contacts at open position
關(guān)合位置刀刃邊至瓷瓶頂距離(mm)
Distance between the switch pole and the porcelain collar at close position
結(jié)論
Conclusion
備注
Remark
技術(shù)負(fù)責(zé)人:
Technical responsible person
質(zhì)量檢查員:
Quality inspector
班(組)長:
Group leader
年 月 日
Year Month Date
收藏
編號:1630137
類型:共享資源
大?。?span id="3jbn3zb" class="font-tahoma">1.29MB
格式:RAR
上傳時(shí)間:2019-10-31
3
積分
- 關(guān) 鍵 詞:
-
SH
3503-2007
石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定
中英文對照表格
3503
2007
石油化工
建設(shè)
工程項(xiàng)目
交工
技術(shù)
文件
規(guī)定
中英文
對照
表格
- 資源描述:
-
SH 3503-2007 石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定 中英文對照表格.rar,SH,3503-2007,石油化工建設(shè)工程項(xiàng)目交工技術(shù)文件規(guī)定,中英文對照表格,3503,2007,石油化工,建設(shè),工程項(xiàng)目,交工,技術(shù),文件,規(guī)定,中英文,對照,表格
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書面授權(quán),請勿作他用。